These are the sequence of events in the process of the development of your site.
1. Preparing for the development, organization and formulation of requirements.
At this first stage, you the customer will determine the type of site created, the volume of the site and will choose a suitable site template and prepare the text and photo material for the primary site content. The duration of this stage is from 7-14 days and depends on the efficiency of interaction of the customer or in some cases customer's representative and the developer. The customer will be responsible for the following:
- The customer determines the type and amount of site content.
- The customer determines which interactive components are needed on the site (online shop, forum, message board, order forms, product catalog, interviews, etc.)
- The developer estimates the cost of development based on customer requirements and the estimated volume of site content.
- After agreeing on the cost of developing customer chooses a template site.
- The customer prepares and submits the developer text and photo materials for the primary site content (including the logo, if available). All materials for the customer's site will be delivered to the developer in electronic form (text documents in a format Word, txt, Excel, PDF, Photo & Logo format jpg, bmp and or png). In this case, the developer together with the customer determine the structure of content (sections, headings, categories, and menus).
- The developer makes the layout of the site based on a template and preliminary materials.
- The customer approves the layout, or in conjunction with the developer specifies the structure of content. At this point, you can change the design template, estimating the clear presentation of real materials.
2. Development of the site.
Following the approval of site model customer chooses the domain name for the site (if the name does not exist yet) and pays the domain registration and hosting location site where the service is ordered. The developer proceeds to programming elements of the site based on customer defined requirements. The duration of this stage is from 7 to 21 days depending on the amount of materials and complexity of demands.
- The customer selects the name of the domain (if the domain yet).
- The customer chooses a hosting, or trusts the developer to choose a hosting company.
- Customer pays for domain name registration and hosting.
- The developer proceeds to programming elements of the site based on customer defined requirements.
- The development phase is broken down into substeps, each Substep ends implementing certain functions of the site. At the end of substeps developer puts the work on a hosting agreement for Substep works with the customer.
- During the development phase of the Customer provides additional material for filling the site within a certain amount of original content of the site can also be refined structure of the site materials.
3. Transmission site in operation.
After the last stages 1 and 2 have been completed a comprehensive testing site can be developed. Also at this stage is determined whether enough of the site for the initial requirements of the Customer. If necessary, determined by the amount of additional functions and / or additional materials for the site content. The developer estimates the cost of additional works and, after consultation with the customer value, begin again to develop on the basis of the additional requirements, steps 2-3 are cyclically repeated. The duration of this stage is from 2 to 15 days depending on the coordinated work of the representative customers and developers. Agrees the timing of additional works on the basis of their size and complexity.
Payment.
At the end of each of the 3 stages of the customer pays a third of the total development cost. If you need additional work, the customer pays the agreed value of additional work at the beginning of the following stage before completion.





